Your current location: Home > Products > Exterior Wall Hanging System

Exterior wall back bolt hanging system

名人娱乐,信誉保障的娱乐平台

product type: integrated type

place of origin: China

payment: by T/T

Packing: wooden pallet

lead time: one month

brand: BEST


优博娱乐手机版,优博娱乐官网,优博娱乐 名人娱乐,信誉保障的娱乐平台  
Description:

Best Exterior wall drop siding system mainly consists of Best boards, light-weight keels or steel-work keels. It is mostly used for villas, low-rising residential building, hotel and other public buildings. It has many advantages such as light in weight, short in installation period, fashional, clean, individualized, environment friendly, durable and fire-proof. The use of Best Exterior wall drop siding system makes building look class and beautiful. Best board has flat type and wooden texture type and the installation of them is the same.


Installation Steps

1.Check the walls if the surface is smooth.

2.Find out the base of the walls and draw lines as marks for the installation of keels.

3.Arrange the keels and fix them. Either 50# light weight steel or 3.5*3cm wood log can be used as keels. Fix the keels on the walls in distance of 60cm by nails or anchor bolt. For wood keels the processing of anticorrosion is necessary, and around doors and windows reinforced keels must be added.

4.Install the first board from bottom with a nail or 3.5cm long self-tapping screw and fix it on keels. Note: If using self-tapping screw it is necessary to drill holes in advance with a drill. The head of nails or screws can be sunk into the boards by 0.5 to 1 mm. The heads should have preservative treatment and be covered by putty. Distance between drill holes and long edges must be more than 1.2cm, normally 1.5cm. Distance between drill holes and short edges must be 2cm.

5.Use the same way to install the second board, with one edge of the second board stacking 3.5 cm on edge of the first board. Then in stall other ones with the same way. Attention, if walls are wider than boards, joints of two boards on the same level should be right on top of keels, instead of suspending.

6.Keep the gaps between two Sanle boards about 3-5mm wide. After fixing all boards, use PU adhesive (pu25) or ceramic adhesive to fill the gaps. The connecting of boards and corners should be natural and covered with above-mentioned adhesives. When the last board is installed on the top, remember to cover the joint and gap as well so as to keep water away.

7.Boards should be cut to suit the size and shape of doors and windows. Do not make straight joints and remember to cover gaps and joints so as to prevent water leakage.

8.At corners of two walls, Sanle boards must be treated to make the conjunction smooth and beautiful. There are two ways of doing this. One is to make a 45 degree chamfering of two boards and combine them together. Then seal it with tapes. And the other way is to put one board vertically on the other one then seal the joint with tapes.

9.When the installation is finished, use brushes or towels to clean dust on the boards before painting. It is better to use acrylic paint and the painting can be three times (one base paint and two times of surface paint).

  漫赢娱乐官网|全新的老虎机平台
漫赢娱乐|全新的老虎机平台 必赢亚洲捕鱼,信誉保障的娱乐平台 皇冠娱乐网_信誉保障的娱乐平台 漫赢娱乐网址,全新的老虎机平台
必赢亚洲bwin_信誉保障的娱乐平台 必赢亚洲注册,信誉保障的娱乐平台 申博娱乐登录,申博娱乐平台,申博娱乐 尊宝娱乐登录|尊宝娱乐网址|尊宝娱乐
漫赢娱乐官网|全新的老虎机平台 必赢亚洲注册,信誉保障的娱乐平台 优博娱乐手机版,优博娱乐官网,优博娱乐 申博娱乐网,申博娱乐网址,申博娱乐
必赢亚洲官网,信誉保障的娱乐平台 利来娱乐注册|利来娱乐网|利来娱乐 漫赢娱乐手机版,全新的老虎机平台 名人娱乐,信誉保障的娱乐平台
皇冠娱乐网|皇冠娱乐手机登录|皇冠娱乐 必赢亚洲平台,信誉保障的娱乐平台 漫赢娱乐,全新的老虎机平台 优博娱乐手机版,优博娱乐官网,优博娱乐